Industrial emergency? We answer 24/7. Call now: 402-350-5451
Utility exposure

Daylighting buried utilities with hydrovac support.

Controlled excavation and vacuum recovery.

EGM supports daylighting to expose buried utilities and infrastructure at defined locations. Hydrovac methods can help crews remove soil with a controlled approach after locates and site planning.

EGM hydrovac crew working at an excavation site
Real EGM field workUtility excavation operation
Utility exposureHydrovac excavationVacuum recoverySite coordination
How the work comes together

Know what is below before work advances.

Daylighting provides visual confirmation of buried infrastructure at selected points. The scope begins with utility locating, permits, access, soil conditions, and the project owner’s excavation controls.

EGM plans the excavation and spoil recovery around the requested exposure. The appropriate method, clearance procedures, and disposal path depend on the site and material.

Talk through your scope402-350-5451
Project capabilities

What the scope may include.

Work is selected around material, access, site requirements, and the outcome you need.

01 / LOCATE

Set the target

Confirm utility information, markings, permits, and exposure points.

02 / PLAN

Review conditions

Assess access, ground conditions, utility clearance, and spoil handling.

03 / EXPOSE

Daylight the utility

Use a controlled excavation method within the agreed work area.

04 / RECOVER

Manage spoils

Collect excavated material and route it under the site plan.

Before mobilization

Bring the utility and site details.

These details help EGM evaluate the method, equipment, crew, and next steps.

01Utility maps and locate status02Depth and exposure points03Access, surface, and soil conditions04Spoil handling and restoration expectations
How a project moves

From scope to field work.

01 / CONTACT

Describe the work

Share the site, material, timing, and goal.

02 / REVIEW

Shape the plan

Review access, testing, controls, and logistics.

03 / MOBILIZE

Complete the scope

Confirm crew, equipment, and agreed method.

04 / CLOSE

Document the work

Coordinate recovery and project records as needed.

Connected work

Related EGM services.

Many projects combine more than one field capability.

Common questions

What to know before calling.

What is daylighting?

It is the controlled exposure of a buried utility or other subsurface feature so its location can be seen and verified.

Are utility locates still required?

Yes. Project owners and crews must follow applicable utility locating and excavation requirements before work begins.

Start with your scope

Let’s plan the next step.

Tell us the site, material, timing, and work you need done. We will assess the right path.